G.T. GmbH · Berlin
Series A Investment Memorandum
Contents
Eleven blocks · ~30,000 words
The architecture is the asset

The missing physical layer for European energy sovereignty.
-
ES
Executive Summary
Thesis, ask, and the terms on which the platform extends to the firm.
-
I
The Misframing
Why the cell-manufacturing layer failed.
-
II
The State of the Energy Layer
European market diagnosis 2026.
-
III
The Pivot
Cell, Slot, Architecture.
-
IV
Architecture
Three-layer material implementation.
-
V
Climate Performance Potential
100 Mt threshold × 2.1.
-
VI
The Economic Engine
Three revenue layers, capital-light scaling.
-
VII
Risk Architecture
Four structural diversifications.
-
VIII
Team and Track Record
Five operational competencies.
-
IX
Programmes, Partners, Ask
Round structure, institutional request.
-
A
iONE Continental โ Station Manual
Hardware reference, v2.0.
-
B
GT-BAT-SPEC-001 โ Battery Specification
Module-level spec sheet, v1.3.
-
C
CO2 & Finance
Climate impact, revenue model, capital structure.
-
D
iONE OS
Technology stack and orchestration platform.
-
E
Configurator
Climate-zone-based product configurator.
- Issuer
- G.T. GmbH
Berlin, Germany - Recipient
- World Fund
Series A Lead Investor - Document
- Investment Memorandum
v1.0 · May 2026 - Classification
- Confidential
Strictly for the addressee